To indicate proper control of consistency of a freshly mixed concrete for pavement construction, the slump should be between______.

A)
4 to 6 cm
B)
5 to 7 cm
C)
7 to 10 cm
D)
10 to 12 cm

Correct Answer :   7 to 10 cm