The construction manager uses the estimate of the project

A)
to develop bids on the project.
B)
to tell the owner of the project to take his/her financial decision.
C)
to advise the architect/engineer regarding design cost parameter especially in value engineering analysis.
D)
All of the above

Correct Answer :   All of the above