Which method is adopted to develop an approximate or conceptual estimate for perimeter works for buildings from the following:

A)
Base unit method
B)
Cost per cubic metre method
C)
Cost per linear metre method
D)
Cost per square metre method

Correct Answer :   Cost per linear metre method