Correct Answer : All of the above
Correct Answer : mass production
Correct Answer : Critical Path Method
Correct Answer : low
Correct Answer : representative time
Correct Answer : line and staff organisation
Correct Answer : determining the most efficient method of performing a job
Correct Answer : cost reduction
Correct Answer : minimise the cost without change in quality of the product
Correct Answer : normal time of a worker
Correct Answer : production schedule
Correct Answer : group incentive plan
Correct Answer : bucket conveyor
Correct Answer : analyticallayout
Correct Answer : √2AP/C
Correct Answer : an activity
Correct Answer : single time estimate
Correct Answer : Halsey plan
Correct Answer : is applied to all level of workers
Correct Answer : producing more with the same inputs
Correct Answer : stop watch
Correct Answer : dispatch of work orders through shop floor
Correct Answer : synthetic layout
Correct Answer : Yes
Correct Answer : it represents a situation where extra resources are available and the completion of project is not delayed
Correct Answer : The turning of a job on lathe is an event whereas job turned is an activity.
Correct Answer : maintain the required net work
Correct Answer : 500
Correct Answer : utility of the product
Correct Answer : optimum lot size
Correct Answer : factory overheads
Correct Answer : standardisation
Correct Answer : Work sampling
Correct Answer : brain storming
Correct Answer : variable cost line
Correct Answer : one-half
Correct Answer : belt conveyor
Correct Answer : sales revenue and total expensive lines intersect
Correct Answer : 1-2-3-5-6-7-8-9
Correct Answer : static product layout
Correct Answer : job enrichment
Explanation : Job enrichment can be described as a medium through which management can motivate self-driven employees by assigning them additional responsibility normally reserved for higher level employees. By doing this, the employees feel like their work has meaning and is important to the company.
Correct Answer : line organisation
Correct Answer : it represents that a programme falls behind schedule and additional resources are required to complete the project in time
Correct Answer : standard time
Correct Answer : Agree
Correct Answer : an average worker
Correct Answer : earliest completion time and latest allowable time
Correct Answer : minor work
Correct Answer : Correct
Correct Answer : Man-machine chart
Correct Answer : 50
Correct Answer : True
Correct Answer : an arrow
Correct Answer : earliest start time + duration of activity
Correct Answer : on the percentage of time worked
Correct Answer : linear programming
Correct Answer : flow diagram
Correct Answer : travel chart
Correct Answer : hoist
Correct Answer : line, staff and functional organisation
Correct Answer : an activity could be decompressed to the maximum extent of its normal time
Correct Answer : product layout
Correct Answer : normal time plus allowances
Correct Answer : worker's performance on a job
Correct Answer : Programme Evaluation and Review Technique
Correct Answer : whose output exceeds 67% efficiency
Correct Answer : analysis of standard data system
Correct Answer : C
Correct Answer : method study and work measurement
Correct Answer : process layout
Correct Answer : inventory control
Correct Answer : total cost is equal to sales revenue
Correct Answer : produce a definite volume of work per minute
Correct Answer : exponential law
Correct Answer : an event
Correct Answer : production is on large scale
Correct Answer : fixed position layout
Correct Answer : Any one of the above
Correct Answer : prescribes the sequence of operations to be followed
Correct Answer : satisfy the problem constraints and non-negativity restrictions
Correct Answer : machine utilisation
Correct Answer : is concerned with the starting of processes
Correct Answer : relative values of a job
Correct Answer : Emerson's efficiency plan
Correct Answer : 0.84
Correct Answer : subdivision of an operation into therbligs and their analysis
Correct Answer : functional organisation
Correct Answer : creative phase, information phase, investigation phase, evaluation phase
Correct Answer : determines the programme for the operations
Correct Answer : fixed cost + variable cost
Correct Answer : waiting time
Correct Answer : triple time estimate
Correct Answer : A-B-C analysis is based on Pareto's principle.
Correct Answer : zero slack
Correct Answer : short term analysis