Google News
logo
Mechanical Engineering : Industrial Engineering and Production Management - Quiz(MCQ)
P.M.T.S. (Predetermined Motion Time Systems) include
A)
W.F.S. (Work Factor Systems)
B)
B.M.T.S. (Basic Motion Time Study)
C)
M.T.M. (Method Time Measurement)
D)
All of the above

Correct Answer : Option (D) :   All of the above

Advertisement