Google News
logo
Daily Current Affairs
India's first cable-stayed bridge, the Anji Khad bridge will be completed by _____.
A)
May 2024
B)
January 2024
C)
August 2023
D)
May 2023

Correct Answer :   May 2023


* India’s first cable-stayed bridge, the Anji Khad bridge will be completed by May 2023.

* It connects Katra and Reasi via tunnels T2 and T3 on the Katra-Banihal section.

* Aim : To connect J&K to the rest of the country with all-weather rail connectivity

* The cables weigh 848.7 MT and the total length of cable strands involved is 653km,” an official said, describing the Anji Khad bridge as “an engineering marvel built in extreme geographical conditions”.

* The asymmetrical cable-stayed bridge crosses the deep gorges of Anji river, a tributary of river Chenab.

* The total length of the bridge is 725m which includes a 473m long asymmetric cable stay bridge balanced on the axis of a central pylon from the top of foundation, standing above the river bed..

Source : Hindustan Times

Published On : April 28, 2023