Google News
logo
Civil Engineering : Estimating and Costing - Quiz(MCQ)
A)
The unit of lead is 50 m for a distance upto 500 m
B)
The lead is calculated for each block of the excavated area
C)
The unit of lead is 1 km where the lead exceeds 2 km
D)
Lead is the average horizontal straight distance between the borrow pit and the place of spreading soil

Correct Answer :  

Advertisement