Google News
logo
Civil Engineering : Water Supply Engineering - Quiz(MCQ)
Detention period of a settling tank is________.
A)
average time for which water is retained in tank
B)
time required for flow of water to fill the tank fully
C)
average theoretical time required for water to flow through the tank
D)
All of the above

Correct Answer :   All of the above

Advertisement