Google News
logo
Civil Engineering : Surveying - Quiz(MCQ)
Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves_____.
A)
earth work on the centre line
B)
embankment on the centre line
C)
excavation on the centre line
D)
None of the above

Correct Answer :   excavation on the centre line

Advertisement