Google News
logo
Civil Engineering : RCC Structures Design - Quiz(MCQ)
For a continuous floor slab supported on beams, the ratio of end span length and intermediate span length, is
A)
0.6
B)
0.7
C)
0.8
D)
0.9

Correct Answer :   0.9

Advertisement