Google News
logo
Civil Engineering : Waste Water Engineering - Quiz(MCQ)
If the peak discharge of a storm water drain (S.W. Drain) is e.xpected to exceed 150 cumecs, the free board to be provided, is
A)
50 cm
B)
90 cm
C)
100 cm
D)
None of the above

Correct Answer :   100 cm

Advertisement