Google News
logo
Civil Engineering : Estimating and Costing - Quiz(MCQ)
In case of laying gullies, siphons, intercepting traps, the cost includes
A)
Bed concreting
B)
Setting and laying
C)
Connection to drains
D)
All of the above

Correct Answer :   All of the above

Advertisement