Google News
logo
Civil Engineering : Highway Engineering - Quiz(MCQ)
Intermediate catch water drains are provided only, if________.
A)
intensity of rainfall is heavy
B)
single catch water drain is inadequate
C)
catchment area of the watershed above road is large
D)
All of the above

Correct Answer :   All of the above

Advertisement