Google News
logo
Civil Engineering : Concrete Technology - Quiz(MCQ)
Quality control helps to ____________ the risks of overdesign that ___________ the overall cost.
A)
Maximize, Increase
B)
Minimize, Increase
C)
Maximize, Decrease
D)
Minimize, Decrease

Correct Answer :   Minimize, Decrease


Explanation : Quality control helps to minimize the risks of overdesign that reduces the overall cost.

Advertisement