Google News
logo
Civil Engineering : Waste Water Engineering - Quiz(MCQ)
Sewer ventilating columns are generally placed at______.
A)
distances 150 m to 300 m
B)
upper ends of branch sewers
C)
every change in the size of sewers
D)
All of the above

Correct Answer :   All of the above

Advertisement