Google News
logo
Civil Engineering : Irrigation - Quiz(MCQ)
The crest level of a canal diversion head work, depends upon______.
A)
pond level
B)
F.S.L. of the canal
C)
discharge perimeters
D)
All of the above

Correct Answer :   All of the above

Advertisement