Google News
logo
Civil Engineering : Surveying - Quiz(MCQ)
The distances AC and BC are measured from two fixed points A and B whose distance AB is known. The point C is plotted by intersection. This method is generally adopted in_______.
A)
triangulation
B)
traverse method of surveys
C)
chain surveying
D)
None of the above

Correct Answer :   chain surveying

Advertisement