Google News
logo
Civil Engineering : Water Supply Engineering - Quiz(MCQ)
The duration of contact of chlorine with water before it is served to the first consumer, should be at least________.
A)
20 to 30 minutes
B)
15 to 20 minutes
C)
10 to 15 minutes
D)
30 to 40 minutes

Correct Answer :   20 to 30 minutes

Advertisement