Civil Engineering : Estimating and Costing - Quiz(MCQ)
The expected out turn for earth work in excavation in ordinary soil per mazdoor per day is
A)
4.00 cubic meter
B)
3.00 cubic meter
C)
2.00 cubic meter
D)
1.00 cubic meter

Correct Answer :   3.00 cubic meter