Google News
logo
Civil Engineering : Irrigation - Quiz(MCQ)
The most suitable location of a canal head work, is______.
A)
trough stage of the river
B)
rock stage of the river
C)
delta stage of the river
D)
boulders stage of the river

Correct Answer :   trough stage of the river

Advertisement