Google News
logo
Civil Engineering : Construction Management - Quiz(MCQ)
The reduction in project time normally results in_____.
A)
Increasing the direct cost and indirect cost both
B)
Decreasing the direct cost and indirect cost both
C)
Increasing the direct cost and decreasing the indirect cost
D)
Decreasing the direct cost and increasing indirect cost

Correct Answer :   Increasing the direct cost and decreasing the indirect cost

Advertisement