Google News
logo
Civil Engineering : Railways - Quiz(MCQ)
To design a cross-over between parallel tracks, the required components are :
A)
two switch points, two acute angle crossings and four check rails
B)
two switch, points, two acute angle crossings and two check rails
C)
two switch points, two acute angle crossings and six check rails
D)
None of the above

Correct Answer :   two switch points, two acute angle crossings and four check rails

Advertisement