Which one of the following statements is not correct with regard to heading and hench-ing method of tunnelling.
A)
Driving of tunnel is done in two portions of its section
B)
Driving the top portion is done in advance of the bottom portion
C)
Firing of head holes is done just before the bench holes are fired
D)
After driving the top portion 3 m to 3.5 m holes are drilled into the head and bench

Correct Answer :   Firing of head holes is done just before the bench holes are fired