Google News
logo
Civil Engineering : Water Supply Engineering - Quiz(MCQ)
Yield of a drainage basin is :
A)
average run off over a short period
B)
run off of the area expressed as instantaneous rate
C)
total volume of water flowing annually
D)
All of the above

Correct Answer :   total volume of water flowing annually

Advertisement