Google News
logo
SAP Production Planning (PP) - Interview Questions
List out the basic procedure for dispatching operations in capacity leveling?
For dispatch operations basic procedure includes :
 
* Either the user determines the date of dispatch or else it is specified by scheduling
* A dispatching sequence needs to be determined if several operations need to be dispatched
* The systems checks for
* The dates to which operations are to be dispatched
* The work center to which operations are to be dispatched
* Finite scheduling is performed
* Operation check is performed
* Status for the operation is set as “dispatched.”
* System carries out midpoint scheduling.
Advertisement