Civil Engineering : Construction Management - Quiz(MCQ)
A)
Output of labour
B)
Output of machinery
C)
Number of operations
D)
All of the above

Correct Answer :   All of the above

A)
a firm
B)
a person
C)
an agency
D)
All of the above

Correct Answer :   All of the above

A)
10 days
B)
13 days
C)
14 days
D)
19 days

Correct Answer :   14 days

A)
Engineer
B)
Junior Engineer
C)
Executive Engineer
D)
Assistant Engineer

Correct Answer :   Engineer

A)
light construction
B)
heavy construction
C)
industrial construction
D)
None of the Above

Correct Answer :   heavy construction

A)
Major works
B)
Large projects
C)
Minor works
D)
All of the above

Correct Answer :   Minor works

A)
Survey of the site
B)
Initiation of proposal
C)
Preparation of tender
D)
Preparation of estimate

Correct Answer :   Initiation of proposal

A)
TL-EFT
B)
LFT-EFT
C)
LST-EST
D)
All of the above

Correct Answer :   All of the above

A)
(t₁ - t₂) - t
B)
(t₁ + t₂) - t
C)
t + (t₁ - t₂)
D)
t - (t₁ - t₂)

Correct Answer :   (t₁ - tâ‚‚) - t

A)
50 %
B)
75 %
C)
89.9 %
D)
100 %

Correct Answer :   50 %

A)
planning
B)
execution
C)
designing
D)
All of the above

Correct Answer :   All of the above

A)
CPM analysis is activity oriented
B)
PERT analysis is event oriented
C)
In CPM, the time is related to cost
D)
All of the above

Correct Answer :   All of the above


Explanation : * CPM analysis is activity oriented
* PERT analysis is event oriented
* In CPM, the time is related to cost
* CPM does not make any allowance for the uncertainties in the duration of time

A)
major projects
B)
minor projects
C)
Large projects
D)
None of the Above

Correct Answer :   minor projects

A)
Bar chart method
B)
Milestone chart
C)
Critical path method (CPM)
D)
Programme Evaluation and Review Technique (PERT)

Correct Answer :   Bar chart method

A)
Optimistic time estimate refers to activities
B)
Most likely time estimate refers to activities
C)
Expected time estimate refers to activities
D)
All of the above

Correct Answer :   All of the above


Explanation : * Optimistic time estimate refers to activities
* Pessimistic time estimate refers to activities
* Most likely time estimate refers to activities
* Expected time estimate refers to activities

A)
zero float
B)
minimum float
C)
maximum float
D)
None of the Above

Correct Answer :   zero float

A)
departmental representative or user
B)
local civil authority representative
C)
representative of engineer authority
D)
All of the above

Correct Answer :   All of the above


Explanation : * departmental representative or user
* local civil authority representative
* representative of engineer authority
* representative of administration

A)
effective command and control
B)
defined responsibilities at all levels
C)
ability of quick decision at all levels
D)
All of the above

Correct Answer :   All of the above


Explanation : * effective command and control
* defined responsibilities at all levels
* rigid discipline in the organisation
* ability of quick decision at all levels

A)
light construction
B)
industrial construction
C)
heavy construction
D)
electrical construction

Correct Answer :   industrial construction

A)
fixing of door
B)
selecting sites
C)
concrete cured
D)
plastering of walls

Correct Answer :   concrete cured

A)
if symmetrical, are called normal curves
B)
if not symmetrical, are called skew curves
C)
having a single lump, are called uninodal curves
D)
All of the above

Correct Answer :   All of the above

A)
Critical Path Method is event oriented
B)
Critical Path method is event oriented
C)
Programme Evaluation and Review Technique, is event oriented
D)
Programme Evaluation and Review Technique is not event oriented

Correct Answer :   Programme Evaluation and Review Technique, is event oriented

A)
site survey
B)
availability of labour
C)
study of specifications
D)
All of the above

Correct Answer :   All of the above


Explanation : * site survey
* availability of labour
* study of specifications
* availability of construction materials

A)
started 5 days later
B)
completed 5 days later
C)
performed at slower rate in 15 days
D)
All of the above

Correct Answer :   All of the above

A)
event
B)
duration
C)
float
D)
dummy

Correct Answer :   duration

A)
slow time
B)
crash time
C)
normal time
D)
standard time

Correct Answer :   slow time

A)
issue of store equipments
B)
construction measurements
C)
instructions by the executive engineers
D)
names of the casual labour

Correct Answer :   instructions by the executive engineers

A)
rigid structure
B)
top level executions over work
C)
extraordinary delay in communications
D)
All of the above

Correct Answer :   All of the above

A)
selection of site
B)
acquisition of land
C)
formalisation of alignment of work
D)
All of the above

Correct Answer :   All of the above


Explanation : * selection of site
* acquisition of land
* formalisation of alignment of work
* formalisation of designs and preparation of estimate

A)
heavy construction
B)
light construction
C)
private construction
D)
industrial construction

Correct Answer :   light construction

A)
optimistic time
B)
pessimistic time
C)
most likely time
D)
All of the above

Correct Answer :   All of the above

A)
minimum time
B)
maximum time
C)
minimum cost
D)
maximum cost

Correct Answer :   minimum time

A)
33% at the site and 67% under procurement
B)
50% at the site and 50% under procurement
C)
67% at the site and 33% under procurement
D)
100% at the site

Correct Answer :   67% at the site and 33% under procurement

A)
a circle
B)
a square
C)
a triangle
D)
All of the above

Correct Answer :   All of the above


Explanation : * a circle
* a square
* a triangle
* an ellipse

A)
Costliest critical activity
B)
Cheapest critical activity
C)
Cheapest noncritical activity
D)
Costliest noncritical activity

Correct Answer :   Cheapest critical activity

A)
Equal to X
B)
More than X
C)
Less than X
D)
None of the Above

Correct Answer :   Less than X

A)
Free float
B)
Duration
C)
Total float
D)
Interfering float

Correct Answer :   Free float

A)
Free float and independent float both need not be zero
B)
Free float and independent float both must be zero
C)
Independent float must be zero but free float need not be zero
D)
Free float of the activity must be zero but independent float need not be zero

Correct Answer :   Free float and independent float both must be zero

A)
float
B)
event
C)
duration
D)
constraint

Correct Answer :   float

A)
preparation of estimates
B)
preparation of specifications
C)
initiating the procurement action of resources
D)
All of the above

Correct Answer :   All of the above


Explanation : * preparation of estimates
* preparation of specifications
* initiating the procurement action of resources
* taking remedial action for likely bottleneck in the execution

A)
a project is divided into various activities
B)
required time for each activity is established
C)
sequence of various activities is made according to their importance
D)
All of the above

Correct Answer :   All of the above


Explanation : * a project is divided into various activities
* required time for each activity is established
* sequence of various activities is made according to their importance
* net work is drawn by connecting the activities and the events

A)
a+5m+b / 6
B)
a+4m+b / 6
C)
a+3m+b / 6
D)
a+m+b / 6

Correct Answer :   a+4m+b / 6

A)
1880
B)
1890
C)
1900
D)
1920

Correct Answer :   1900

A)
effective organisation
B)
line organisation
C)
functional organisation
D)
line and staff organisation

Correct Answer :   line organisation

A)
Critical ratio scheduling
B)
Short interval scheduling
C)
Event flow scheduling technique
D)
Slotting technique for scheduling

Correct Answer :   Critical ratio scheduling

A)
1920
B)
1930
C)
1940
D)
1950

Correct Answer :   1940

A)
functional organisation
B)
line organisation
C)
effective organisation
D)
line and staff organisation

Correct Answer :   functional organisation

A)
functional organisation
B)
line organisation
C)
line and staff organisation
D)
None of the Above

Correct Answer :   line organisation

A)
dots
B)
crosses
C)
vertical lines
D)
horizontal lines

Correct Answer :   horizontal lines

A)
Bar chart
B)
Gantt chart
C)
Modified Mile stone chart
D)
All of the above

Correct Answer :   All of the above

A)
Chief Engineer
B)
Executive Engineer
C)
Assistant Engineer
D)
Superintending Engineer

Correct Answer :   Chief Engineer

A)
D = EF - ES
B)
EF = ES + D
C)
LS = LF - D
D)
All of the above

Correct Answer :   All of the above


Explanation : * EF = ES + D
* LS = LF - D
* LF = LS + D
* D = EF - ES

A)
Event
B)
Dummy
C)
Activity
D)
Contract

Correct Answer :   Activity

A)
Event
B)
Node
C)
Connector
D)
All of the above

Correct Answer :   All of the above

58 .
A four wheel truck or whose operating weight is 12000 kg is pulled along a road having a rising slope of 2% at a uniform speed. Assume grade resistance factor = 10 kg/tonne. The tension in the tow cable is 720 kg. The rolling resistance of the road will be
A)
50 kg/tonne
B)
40 kg/tonne
C)
30 kg/tonne
D)
20 kg/tonne

Correct Answer :   40 kg/tonne

59 .
A tractor whose weight is 20 tonnes has a drawbar pull of 2500 kg, when operated on a level road having a rolling resistance of 30 kg per tonne. If this tractor is operated on a level road having a rolling resistance of 40 kg per tonne, then the drawbar pull of the tractor will
A)
Reduce by 200 kg
B)
Increase by 200 kg
C)
Increase by 250 kg
D)
Reduce by 250 kg

Correct Answer :   Reduce by 200 kg

A)
Moist loam
B)
Wet sticky clay
C)
Sand and gravel
D)
Good common earth

Correct Answer :   Wet sticky clay

62 .
If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is
A)
500 cum
B)
1000 cum
C)
1500 cum
D)
2000 cum

Correct Answer :   500 cum

A)
Slow time
B)
Crash time
C)
Normal time
D)
Standard time

Correct Answer :   Slow time

A)
Scraper
B)
Bulldozer
C)
Dump truck
D)
Clam shell

Correct Answer :   Dump truck

A)
2 kg/tonne
B)
6 kg/tonne
C)
9 kg/tonne
D)
20 kg/tonne

Correct Answer :   9 kg/tonne

A)
its latest start time and earliest start time
B)
its latest finish time and earliest start time for its successor activity
C)
its earliest finish time and latest start time for its successor activity
D)
its earliest finish time and earliest start time for its successor activity

Correct Answer :   its earliest finish time and earliest start time for its successor activity

67 .
Consider the following features/factors :

1. Projects are of the non-repetitive type
2. Time required need not be known
3. Time required is known precisely
4. Events have been established for planning
5. Emphasis is given to activities of project

PERT is preferred for planning because of
A)
1, 2 and 4
B)
1, 3 and 4
C)
1, 2 and 5
D)
3, 4 and 5

Correct Answer :   1, 2 and 4

68 .
Consider the following statements :

In the bar chart planning

1. Interdependence of the operations cannot be portrayed.
2. Progress of work can be measured.
3. Spare time of the activities can be determined.
4. Schedule cannot be updated.
A)
1, 2 and 3 are correct
B)
1, 2 and 4 are correct
C)
1 and 4 are correct
D)
2, 3 and 4 are correct

Correct Answer :   1 and 4 are correct

69 .
An excavator costs Rs. 20,00,000 and has an estimated life of 8 years. It has no salvage value at the end of 8 years. The book value of the excavator at the end of 3 years using general double declining balance method is
A)
Rs. 8,75,000
B)
Rs. 8,43,750
C)
Rs. 10,50,000
D)
Rs. 11,56,250

Correct Answer :   Rs. 8,43,750

A)
An activity
B)
An event
C)
Both (A) and (B)
D)
None of the Above

Correct Answer :   An event

A)
Sheep foot rollers
B)
Tampers
C)
Vibratory rollers
D)
Smooth-wheeled rollers

Correct Answer :   Sheep foot rollers

A)
On all the activities
B)
On all the activities lying on the critical path
C)
Only on activities lying on the original critical path and having flatter cost slopes
D)
On original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope

Correct Answer :   On original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope

A)
Less than earliest event time of the following node
B)
Greater than earliest event time of the following node
C)
Less than or equal to earliest event time of the following node
D)
Greater than or equal to earliest event time of the following node

Correct Answer :   Less than or equal to earliest event time of the following node

74 .
Consider the following statements :

In the critical path method of construction planning, Free Float can be.

1. Greater than Total Float.
2. Greater than Independent Float
3. Equal to Total Float.
4. Less than Independent Float
A)
1 and 2 are correct
B)
2 and 3 are correct
C)
1 and 4 are correct
D)
2 and 4 are correct

Correct Answer :   2 and 3 are correct

A)
The soil survey, traffic survey, concept design and approximate cost
B)
The contract documents for inviting tenders
C)
The detailed estimated cost based on detailed design
D)
The several alternatives of the project that have been considered

Correct Answer :   The soil survey, traffic survey, concept design and approximate cost

A)
Updating
B)
Resource levelling
C)
Resource smoothening
D)
Critical path scheduling

Correct Answer :   Updating

A)
less than latest event time of preceding node
B)
greater than or equal to latest event time of preceding node
C)
equal to latest event time of preceding node
D)
less than or equal to latest event time of preceding node

Correct Answer :   greater than or equal to latest event time of preceding node

79 .
A machine costs Rs. 20000 and its useful life is 8 years. The money is borrowed at 8% interest per annum. The capital recovery factor at 8% interest per annum for 8 years is 0.174. The annual equipment cost of the machine will be___.
A)
Rs. 7350
B)
Rs. 6960
C)
Rs. 5220
D)
Rs. 3480

Correct Answer :   Rs. 3480

A)
Wet sticky clay
B)
Good common earth
C)
Moist loam
D)
Well blasted rock

Correct Answer :   Moist loam

A)
Hoe
B)
Shovel
C)
Dragline
D)
None of the Above

Correct Answer :   Hoe

A)
Asphalt
B)
Concrete
C)
Loose sand
D)
Firm earth

Correct Answer :   Loose sand

A)
Hoe
B)
Drag line
C)
Clam shell
D)
Dipper shovel

Correct Answer :   Drag line

84 .
Rolling resistance of a wheel depends upon

(i) Vehicle load
(ii) Grade
(iii) Ground conditions
A)
Only (i) is correct
B)
(i) and (ii) are correct
C)
(ii) and (iii) are correct
D)
(i) and (iii) are correct

Correct Answer :   (i) and (iii) are correct

A)
For the purchase of construction materials
B)
For the payment of advances to labour and other staff
C)
On commencement of work at site for payment of loan taken by him
D)
For all activities required to start the work at site on finalization of the contract document

Correct Answer :   For all activities required to start the work at site on finalization of the contract document

A)
Rate of inflation
B)
Increase in rates of only important materials
C)
Variation in cost in materials element, labour element and petrol-oil-lubricant element
D)
Variation in total cost of the project on an ad hoc basis

Correct Answer :   Variation in cost in materials element, labour element and petrol-oil-lubricant element

A)
Reduction in wastage of inspection costs
B)
Measurement of risks to eliminate failures
C)
Reduction in costs for the removal of defects
D)
Applying the theory' of probability to sample testing or inspection

Correct Answer :   Applying the theory' of probability to sample testing or inspection

88 .
Wheeled tractors are replacing crawler tractors because

1. Wheeled tractors travel faster.
2. Crawler tractors are more expensive.
3. Track parts of a crawler wear out quickly.
4. Crawler tractors have stick control.

of following statements
A)
1, 2 and 3 are correct
B)
1, 2 and 4 are correct
C)
1, 3 and 4 are correct
D)
2, 3 and 4 are correct

Correct Answer :   1, 2 and 3 are correct

89 .
If the expected time of completion of a project is 60 weeks with a standard deviation of 5 weeks, the probability of completing the project in 50 weeks and 65 weeks respectively will be
A)
15.9% and 97.7%
B)
2.3% and 84.1%
C)
97.7 % and 15.9%
D)
97.7% and 84.1%

Correct Answer :   2.3% and 84.1%

A)
Increasing the direct cost and indirect cost both
B)
Decreasing the direct cost and indirect cost both
C)
Increasing the direct cost and decreasing the indirect cost
D)
Decreasing the direct cost and increasing indirect cost

Correct Answer :   Increasing the direct cost and decreasing the indirect cost